Team floor plan · ISSA Show North America · Bayside Halls · November 17 to 19
STEP 1Read the planSection A lists your people, their titles and their team. Section B shows how much each team should care about each part of the floor.
STEP 2Make it yoursChange a priority in section B. In section C, browse the booths in each category and add the ones each team should visit, with your reason.
STEP 3Share it
Must go this team should not miss itWorth a stop go if you are nearbyIf time low priority for this teamSkip your call
A · Your team
Everyone registered from your company, with the title they gave and the team we placed them in.B · Who goes where
Starting priorities come from what contractors in the same role asked to see at registration. Select a box to set its priority, see the booths in that category and the floor map side by side, and add booths for that team.C · The booths, by category
Pick a category to see every booth in it, why it matters at your size, and add booths to a team's list.Booths in this category
Add the ones a team should visit, and say why.D · Your visit list
The booths you chose, by team, with your reason for each.Drawn byAltus Collective
DataISSA registrations to Nov 2
ScaleSchematic, not to scale
SheetTeam plan
